No two situations are alike and no two projects will ever be exactly the same.  Our method of handling your project will be first to determine the specifics of your current situation and your objectives.  We want to know your situation, requirements, and desires because our services are designed around your particular needs.

We will then give you our advice on the effects of regulatory programs and other outside factors that have a bearing on your situation, and we will develop a program that meets your objectives by incorporating the best available technology and the lowest life cycle cost into a facility that provides for current needs, allows for anticipated near and midterm growth, and provides for economical expansion.

As an integral part of the solution to the problem we will consider all possible methods of financing your project, including Federal or State grants or loans, and will advice you or work with your fiscal agent on the most appropriate method or methods for financing your program.

Holding down cost by maintaining a tight time schedule is an important way we can serve our clients, and we make every effort to complete our work as quickly as possible and to assist and advise everyone else involved in the project so they can keep their part of the work on schedule.

 

PROJECT: Madisonville South Main Street Sewer Interceptor, Phases 1A.1, 1A.2, 1B
OWNER: City of Madisonville, KY        
COMPLETION DATE: 2011
COMMENTS: Planning, Design, Permitting, and Construction Inspection of the Madisonville South Main Street Sewer Interceptor Project. This project includes one 1,000 GPM triplex lift station, 3,900 feet of force main, 46,907 feet of 8 to 12 inch gravity sewer, and 42,000 feet of 4 inch service line.

The project scope was to remove approximately 400 homes from either septic system, discharging into the abandon mine works or obsolete package treatment plants.  RJA performed all engineering including permits, pipe routing and sizing, surveying, obtaining easements, design and construction inspection. RJA overcame many unique issues including making a directional bore to a restroom in the middle of a furniture store without having to close the business.

This was one of the largest single residential sewer projects in Madisonville’s history and was completed on time and within budget.

PROJECT: City of Greenville Sub Area 3 Sewer Rehabilitation Project
OWNER: City of Greenville, KY
COMPLETION DATE: 2011        
COMMENTS: RJA’s responsibilities include design, permits, encroachments, construction management and resident inspection.  This project involved the rehabilitation or replacement of manholes and approximately 4,600 feet of main line sewer was rehabilitated using the pipe bursting/lining method.     

This project scope was to determine areas of major infiltration in addition to correcting overflows.  RJA performed extensive camera work.  Many broken lines were discovered in addition to major root blockages.  A plan was developed to clean and burst and upsize the lines, eliminating major infiltration and blockages.  In addition 25 manholes were repaired and grouted.

clock

PROJECT: Greenville Streetscape Phase 1
OWNER: City of Greenville, KY
COMPLETION DATE: 2008 & 2010
COMMENTS: RJA has completed design and construction inspection of the project involving the replacement of the sidewalks, historic street lighting, storm sewer and ADA crosswalks and ramps in downtown Greenville. RJA was responsible for the survey, utility relocation, design, new traffic signals, concrete testing, permits and construction management for this project.  A traffic signal project was completed in May 2010 using historic traffic poles to match the street lights and town clock.

Environmental Services includes: ISO 14001 Environmental Management Systems, Phase I and II ASTM environmental site assessment, remediation design and supervision, underground storage tank regulatory compliance, industrial storm water management plans, soils, geologic and hydrogeologic studies, landfill and waste disposal studies and permits, compliance audits, spill prevention, control and countermeasures plans, KPDES monitoring, field sampling, wetland delineation and mitigation

  • SOIL REMEDIATION FOR PROPERTY TRANSFER, OWENSBORO, KY
  • UNDERGROUND TANK REMOVAL BETWEEN CITY OWNED NATURAL GAS LINE, WATER LINE, SEWER LINE, AND STORM DRAIN
  • WETLAND DETERMINATION-NOT EVERY WET AREA IS A WETLAND
  • ASTM AUDITS WILL REVEAL DANGEROUS SITUATIONS, ELECTRICAL TRANSFORMERS LEANING OVER COMPRESSED OXYGEN TANKS
  • US ARMY CORPS OF ENGINEERS NATIONWIDE 14 PERMIT REQUIRED BEFORE WORK COULD BEGIN.