PROJECT: Hudson Park Drive Subdivision
COMPLETION DATE: 2008
COMMENTS: RJA is responsible for site design including storm water engineered controls, storm water permitting, storm water best management practices plan.
PROJECT: New Hope Meadows
OWNER: Habitat for Humanity
COMPLETION DATE: 2003
COMMENTS: The Phase I subdivision design includes lots for 27 homes and 750 feet of 8 inch gravity sewer line for proposed Habitat for Humanity housing development. Phase II and III are in the preliminary stages of design and will double the size of the subdivision and include additional sewer and water line extensions.
PROJECT: Crofton – Sidewalk, Storm Water and Street Improvements
OWNER: City of Crofton, Kentucky
COMPLETION DATE: 2002
COMMENTS: The design consisted of the removal of existing curb and sidewalk and the installation of new storm sewer and curbing along the business section of downtown Crofton. This project was highlighted because of the desire to maintain business operation while directing drainage away from the front of the businesses. This aspect was further complicated by the relatively flat area and the need not to disturb the elevation of the existing sidewalks and parking areas.
- 1
- 2