Madisonville Community College Drainage Basin
PROJECT: Madisonville Community College Drainage Basin
OWNER: Madisonville Community College
COMPLETION DATE: 2012
COMMENTS: RJA was responsible for the surveying, design (including hydrologic analysis), permits and construction management of this project. This project allows for a controlled discharge of storm water from the College parking lot and grounds into the City’s water supply. The design included a 3 acre storm water retention basin with a 48 inch and 60 inch CMP for low and high water discharge. This project involved the cooperation of the Madisonville Community College, City of Madisonville and one adjacent landowner.