2nd Baptist Church PROJECT: 2nd Baptist ChurchOWNER: 2nd Baptist ChurchCOMPLETION DATE: 2003COMMENTS: RJA designed the site grade and drainage plan for a 15 year development plan. Included in the design was a landscaped walking trail and storm water detention lake. Prev Next