Dawson Springs Airport Project

PROJECT: Dawson Brings Airport Drainage Improvements
OWNER: City of Dawson Springs, KY
COMPLETION DATE: 2012
COMMENTS: RJA completed the survey, design (including hydrologic analysis) and construction inspection of the airports drainage improvements. The design included retention basin, new 42 inch CMP pipe arch and 3,900 feet of stream bank stabilization.